翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

List of driverless trains : ウィキペディア英語版
List of automated urban metro subway systems

The London Underground's Victoria line, opened in 1967, was the first line operated with Automatic Train Operation ATO. Many lines now operate like that, with the aim of improving the frequency of service. Since then, ATO technology has been developed to enable trains to operate without a driver in a cab: either with an attendant roaming within the train, or with no staff on board.
This list focuses heavily on trains in the classical sense used for large-scale metros and railways but does include a few people mover systems.
The list is ordered in descending order of the degree of automation. It uses the Grade of Automation classifications specified by the standard IEC 62290‐1.〔http://webstore.iec.ch/webstore/webstore.nsf/artnum/036384!opendocument〕 These are explained diagrammatically by the UITP〔http://metroautomation.org/automation-essentials/〕
* In a Grade of Automation 4 (GoA4) system like the Copenhagen Metro, trains are capable of operating automatically at all times, including door closing, obstacle detection and emergency situations. On-board staff may be provided for other purposes, e.g. customer service, but are not required for safe operation.
* In a Grade of Automation 3 (GoA3) system like the Docklands Light Railway, trains run automatically from station to station but a staff member is always in the train, with responsibility for door closing and handling of emergency situations. In a GoA3 system, the train cannot operate safely without the staff member on board.
* In a Grade of Automation 2 (GoA2) system with ATO like London Underground Victoria line, trains run automatically from station to station but a driver is in the cab, with responsibility for door closing, obstacle detection on the track in front of the train and handling of emergency situations.
== Grade of Automation 4 Systems ==
These systems are capable of unattended train operation (UTO), although some operators may choose to staff trains anyway.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「List of automated urban metro subway systems」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.